NCI as a subconsultant was responsible for the design and plan preparation for the rehabilitation of the structure over an abandoned railroad in Miami County, Indiana. The primary objectives of this project were to extend the service life and improve the safety of the bridge crossing. The rehabilitation involved removing the substandard concrete bridge railing, approach railing, approach slabs, and milling the existing concrete deck. A new concrete overlay was then placed along with new INDOT standard bridge railing. The project also milled and resurfaced approximately 160 feet of the mainline pavement and shoulders on each side of the bridge.

CLIENT: United Consulting Engineers & Architects/Indiana Dept of Transportation

Get the Latest News & Updates

Insider grants, links to important engineering workshops and deadlines, as well as fun relevant articles to improve your work and life outside of engineering are a sign-up away. Our ONCE A MONTH email is all you need to stay up-to-date with the engineering world. Click on the link to the right to sign up today!