NCI was responsible for the survey, preliminary engineering, final design, and preparation of construction plans for the replacement of a structure on SR-46 over Mosquito Creek (Persian Gulf Veterans Bridge), in Niles, Ohio. The final design phase included replacing the structure with a single span steel plate girder bridge on pile supported semi-integral wall abutments with a composite reinforced concrete deck.

CLIENT: Ohio Department of Transportation

Get the Latest News & Updates

Insider grants, links to important engineering workshops and deadlines, as well as fun relevant articles to improve your work and life outside of engineering are a sign-up away. Our ONCE A MONTH email is all you need to stay up-to-date with the engineering world. Click on the link to the right to sign up today!