NCI was responsible for design and plan preparation as part of this two-year contract to replace aging waterlines throughout Toledo, Ohio. Projects in 2014 involved the preparation of two (2) construction packages to replace 15,000 feet of existing 4” and 6” waterline with new 8” waterline at eleven (11) locations. In 2015, projects involved the preparation of two (2) construction packages to replace 16,000 feet of existing 6” and 8” waterline with new 8” and 10” waterline at seven (7) locations. Design work included waterline layout, waterline details, trench details, roadway resurfacing details, and storm water pollution protection plans.

CLIENT: City of Toledo

Get the Latest News & Updates

Insider grants, links to important engineering workshops and deadlines, as well as fun relevant articles to improve your work and life outside of engineering are a sign-up away. Our ONCE A MONTH email is all you need to stay up-to-date with the engineering world. Click on the link to the right to sign up today!