As part of its Bridge Professional Services task order contract, NCI was responsible for the design and construction assistance for the rehabilitation of Bridge 13373, McNamara Terminal Ramp C and C2 over Dingell Drive at the Detroit Metropolitan Airport. Rehabilitation work included removing & replacing portions of the bridge barrier railing, replacing the expansion joints, and substructure repair.

CLIENT: Wayne County Airport Authority

Get the Latest News & Updates

Insider grants, links to important engineering workshops and deadlines, as well as fun relevant articles to improve your work and life outside of engineering are a sign-up away. Our ONCE A MONTH email is all you need to stay up-to-date with the engineering world. Click on the link to the right to sign up today!