NCI prepared the preliminary and final road scoping packages for a 3R fix on the I-94 freeway, which also included the rehabilitation of two (2) interchanges within the project limits. Due to the size/length of the project, the roadway was broken into three segments, and three scoping document were prepared as a part of this project. The scope of services includes a detailed review of maintaining traffic and mobility (including C03 analysis, draft TMP, Synchro analysis, and HCS analysis) for the proposed 3R work on I-94, and a cost estimate for the future construction.

CLIENT: Michigan Department of Transportation

Get the Latest News & Updates

Insider grants, links to important engineering workshops and deadlines, as well as fun relevant articles to improve your work and life outside of engineering are a sign-up away. Our ONCE A MONTH email is all you need to stay up-to-date with the engineering world. Click on the link to the right to sign up today!