NCI was responsible for the analysis and recommendation of feasible measures for preventing blockage in the existing 6” force main near State Route 44. A maintenance schedule was developed, cost estimates for feasible options were analyzed, and a sanitary sewer grinder station (the selected alternative) was designed. The design included preparation of construction plans, specifications, and engineer’s estimate of construction costs for the proposed in-line grinder and well at the Portage Service Plaza near the existing pump station. NCI also was responsible for the project survey and utility coordination.

CLIENT: Ohio Turnpike and Infrastructure Commission

Get the Latest News & Updates

Insider grants, links to important engineering workshops and deadlines, as well as fun relevant articles to improve your work and life outside of engineering are a sign-up away. Our ONCE A MONTH email is all you need to stay up-to-date with the engineering world. Click on the link to the right to sign up today!