NCI was responsible for developing detailed construction plans as well as an estimate of construction costs for the reconstruction of an existing gravel/asphalt parking lot. The gravel portion of the lot was removed to full depth and replaced with new asphalt. The existing asphalt was then overlaid at a variable depth to eliminate areas of existing ponding. A new drainage system was added to sufficiently drain site stormwater. In addition, construction included the addition of two perimeter islands, decorative lighting, and a decorative iron fence.

CLIENT: City of Miamisburg

Get the Latest News & Updates

Insider grants, links to important engineering workshops and deadlines, as well as fun relevant articles to improve your work and life outside of engineering are a sign-up away. Our ONCE A MONTH email is all you need to stay up-to-date with the engineering world. Click on the link to the right to sign up today!