NCI performed the construction staking and layout for this reconstruction that involved the removal and replacement of Runway 4L/22R and associated taxiways’ pavement, shoulders, and base material; widening of runway and taxiway shoulders; the complete removal of two (2) existing unused connector taxiways; replacement of existing utilities (domestic water main, force main sewer, storm and sanitary sewer, taxiway underdrains, power and communication conduit); replacement of existing airfield and navigation aid lighting, equipment, and conduit; improvements to the grading of the Runway and adjacent Taxiways; improvements to existing airfield signage and pavement markings; and the installation of a temporary asphalt connection to the southern portion of the existing Runway 4L/22R.
CLIENT: AJAX Paving Industries/Wayne County Airport Authority