NCI was responsible for the survey, design, public meetings, funding application assistance, and preparation of bidding documents for this project located adjacent to the University of Michigan in the City of Ann Arbor, Michigan. Work included replacement design of 2 structures over State Street and the Ann Arbor Railroad; 6 MSE wall runs; extension of a pedestrian tunnel; reconstruction, widening, and non-motorized improvements along 0.75 miles of Stadium Boulevard, State Street, White Street, and Rose Avenue; watermain relocation; sanitary sewer relocation; stormwater detention & quality improvement; street lighting; landscaping; detour route studies & plans; right-of-way plats & descriptions; and construction assistance.

CLIENT: City of Ann Arbor